B & D GREAT NORTHERN RAILWAY
PHASE 1 ... PAGE 2



Jack Hammering the asphalt out & the track through it.



Finishing the loop & coming back to where we started on page 1
This also shows our Mulebarrow!

Mel Harris the train builder cutting hole for the bolts.

Dave Moeller helping position a 300# piece of track,
Mel Nethery playing Caltrans - hee-hee!

Ed Reuther & Russ Duclo roadbasing the track.
Ed has like 12 grand kids he wants rides for - hee-hee


Udate - 6/30/2006 .... Here is a shot of that flat car with Melvin and Ray on it that Melvin lent us to put the ballast in with. This is the one we bought in 6/2006 and refurbished. Little did I know then how a proficient a welder I would become and that I would learn to build steel bridges, switches and use the laser to set grades & weld and build all my own track in place one section at a time starting with Phase #2 of our project.

Now here folks we have a real pair! Both good friends of ours & both from the wrong side of the tracks!! Hee-hee. Terrance Rust (Oral Surgeon) and Ed Bigelow (Orthodontist & neighbor) Riding in to help out on the railroad.


RETURN TO LAYOUT PAGE 1
Return to our Dental Site
RETURN TO B & D GREAT NORTHERN RAILWAY
RETURN TO BAD CHARIOTS